翻訳と辞書
Words near each other
・ Svartisen Hydroelectric Power Station
・ Svartklubben
・ Svartknausflya
・ Svartlamon
・ Svalbard Act
・ Svalbard Airport, Longyear
・ Svalbard and Jan Mayen
・ Svalbard Church
・ Svalbard Global Seed Vault
・ Svalbard in fiction
・ Svalbard Radio
・ Svalbard reindeer
・ Svalbard Rocket Range
・ Svalbard Satellite Station
・ Svalbard Treaty
Svalbard Undersea Cable System
・ Svalbardites
・ Svalbardosaurus
・ Svalbardposten
・ Svalbarðseyri
・ Svalbarðshreppur
・ Svalbarðsstrandarhreppur
・ Svalbreen
・ Svale Jonson Smør
・ Svale Solheim
・ Svalia
・ Svalia (river)
・ Svalia, Norway
・ Svaliava
・ Svaliava Raion


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Svalbard Undersea Cable System : ウィキペディア英語版
Svalbard Undersea Cable System

The Svalbard Undersea Cable System is a twin submarine communications cable which connects Svalbard to the mainland of Norway. The two optical fiber cable consist of two segments, from Harstad to Breivika in Andøy, and from Breivika to Hotellneset near Longyearbyen in Svalbard. The segments from Harstad to Breivika are long, respectively, and the segments from Breivika to Hotellneset . Each consists of eight fiber pairs and there are installed twenty optical communications repeaters on each segment. Each segment has a speed of 10 gigabits per second (Gb/s), with a future potential capacity of 2,500 Gbit/s. The system is now the sole telecommunications link to the archipelago.
Planning of the cables started in 2002 by the Norwegian Space Centre (NSC), who wanted increased bandwidth to expand their business at Svalbard Satellite Station (SvalSat). At the time all telecommunications from Svalbard were relayed via communications satellite. Financing was secured through a deal with the National Aeronautics and Space Administration (NASA). The cable system was supplied by Tyco Communications and laying of the cable was carried out by Global Marine Systems in July and August 2003.
==History==
Svalbard was chosen for the location of SvalSat because of its high latitude which allows all satellites in a low Earth orbit with an orbit above to use only a single ground station, yet allow downloading from every orbit. SvalSat opened on 15 April 1999. It was established as a cooperation between NASA and NS. However, the ground station's capacity was limited by its broadband capacity. Transmission took place via a 55-Mbit/s connection via Intelsat, which served the archipelago's needs within telephone and Internet connection.
Telenor and the NSC conducted a feasibility study in 2002 for connecting SvalSat to the mainland by fiber. It was estimated to cost between NOK 400 and 500 million, or US$50 million, which presumed the laying of one cable with satellite used as backup. A stakeholder meeting was held on 24 and 25 July, which saw representatives from NASA, the Integrated Programme Office (IPO), the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) and the European Space Agency (ESA). Later that year the National Polar-orbiting Operational Environmental Satellite System selected Helsinki over Svalbard for its ground station, largely because of the former's connection to the fiber network. NSC was in October offered various prices between US$30 and 40 million for the laying of a single fiber cable.
NSC conducted negotiations with NASA on 31 October 2002, resulting in an understanding of NASA being able to provide $US20 million towards the line, paid of seven years. The following day Telenor stated they were not interested in participating in the venture. Telenor changed its opinion in the following weeks and agreed to press forward on 18 November. The invitation to tender was issued on 21 December, with a deadline of 3 February. Bringing the line out from Andøya was selected because it is the only trawler-free area along the Norwegian coast north of Trondheim. The tender deadline was extended to 25 February. The bids showed the possibility of laying a twin cable ring for US$40 million. However, the cable-laying companies were not willing to accept a payment over seven years.〔
Tyco Communications was announced as the winner on 7 March and negotiations were finalized on 14 April, as a turnkey contract on the condition that the cable could be financed. The main difficulty was that NSC, a foundation, had very little equity, and spent most of its cash on a US$300,000 detailed study for Tyco to advance the planning. Hannon Armstrong was selected as a financial partner and the money was guaranteed by the Ministry of Trade and Industry. The first work took place at Breivika: the land-owner was contacted on 7 May, a sales agreement was signed on 13 May, permits were finalized on 23 May, construction started the next day and the NOK 5-million facility was completed on 25 July. Permission for the installations on Svalbard was granted on 17 June.〔
Cable-laying started on 21 July and lasted until 15 August. The work set a world record deep plow.〔 The work was carried out using the cable-laying vessels ''Cable Innovator'' and ''Maersk Recorder''. Segment 1 was spliced on 1 August and Segment 2 was spliced on 13 August.〔 Any costs exceeding US$40 million were covered by Telenor Svalbard, who levied it on other users on Svalbard over a period of six years.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)